Light in, light out, and a trace that proves it.
Fiber optics
FTTx deployments, precision splicing and OTDR testing — plus route design, outside and inside plant and emergency restoration, with test records that stand up years later.
A fiber route is cheap to test and expensive to guess at. Most of the cost of a fault is not the splice — it is the hours spent working out where the fault is, on a route nobody documented and nobody baselined.
We design, install, splice and certify fiber, and we hand over the OTDR traces and loss budgets that make the next fault a short job. Where a route is already in the ground and failing, we find out why before anyone proposes replacing it.
Loss budgeted before it is built
End-to-end optical budget calculated at design — splice count, connector count, span loss and margin — so the link is known to work before the first duct is opened, and so the as-built can be compared against an expectation.
Every fiber certified, both directions
Bidirectional OTDR and insertion loss testing on every fiber, not a sample. Traces are handed over as the baseline that future fault-finding is measured against.
Built to survive the route it takes
Armoured, rodent-resistant, UV-stable or direct-burial construction chosen for the actual route; duct, sub-duct and blowing where future capacity matters more than today's fiber count.
Restoration that is planned in advance
Splice enclosures and slack loops placed so a break can be repaired without a second excavation, and restoration procedures agreed before a cable is cut rather than during.
Capabilities
Scope of work
Design
- Route survey
- Physical route survey, duct proving and obstruction identification
- Optical budget
- End-to-end loss calculation with splice, connector and margin allowances
- Fiber selection
- G.652.D, G.655 and bend-insensitive types matched to span and application
- Capacity planning
- Fiber count and spare capacity sized against stated growth
- FTTx design
- FTTH, FTTB and FTTP — PON architecture, splitter placement and drop design
Outside plant
- Installation
- Duct installation, cable blowing, pulling, direct burial and aerial
- FTTx build
- Feeder, distribution and drop installation through to the customer premises
- Construction types
- Armoured, rodent-resistant, UV-stable and figure-8 aerial as the route requires
- Jointing
- Fusion splicing in sealed enclosures with documented slack and loop placement
- Termination
- Street cabinets, joint chambers, building entry and fire-stopping
Inside plant
- Structured cabling
- Backbone and horizontal fiber to ANSI/TIA-568, tested and certified
- Distribution
- Patch panels, splice trays, cassettes and containment
- Data centre
- MPO/MTP trunk systems and high-density distribution to TIA-942
- Labelling
- Full identification to a schedule issued with the as-builts
Transmission and testing
- DWDM / CWDM
- Wavelength plan, mux/demux, amplification and channel commissioning
- OTDR
- Bidirectional traces on every fiber, with event tables retained
- Insertion loss
- Light-source and power-meter testing against the calculated budget
- Advanced
- Chromatic and polarisation-mode dispersion testing on long or high-rate spans
- Restoration
- Emergency splicing, fault location and temporary route provision
Figures on these pages describe what we routinely deliver. Anything specific to your site is confirmed from a survey before it is priced.
Standards we work to
ANSI/TIA-568
Commercial building telecommunications cabling
ANSI/TIA-758
Customer-owned outside plant telecommunications infrastructure
ANSI/TIA-942
Telecommunications infrastructure for data centers
IEC 61280
Fibre optic communication subsystem test procedures
IEC 61300
Fibre optic interconnecting devices — test and measurement
ITU-T G.652 / G.655
Single-mode fibre characteristics
ITU-T G.694
Spectral grids for WDM applications
IEC 60794
Optical fibre cables
Typical applications
- FTTx rollout — FTTH, FTTB and FTTP
- Campus and plant backbone fiber
- Substation and control-system fiber links
- Data centre structured fiber and MPO trunking
- Carrier and metro route construction
- DWDM capacity upgrades on existing routes
- Fault location, emergency restoration and route re-certification
What you receive
- Route survey report and optical loss budget calculation
- Installation drawings, duct records and slack-loop locations
- Splice schedule and fiber allocation record
- Bidirectional OTDR traces and event tables, every fiber
- Insertion loss certification against the calculated budget
- Labelling schedule and as-built documentation
- Restoration procedure and recommended spares
Where we do it
Power & utilities
Protection, control, SCADA communications and DC power for grids and substations.
Transportation
Operational radio, corridor networks and passenger communications for transport.
Oil & gas
Hazardous-area communications and DC power for plants, terminals and offshore.
Government authorities
Mission-critical radio, secure networks and standby power for public agencies.
Frequently asked questions
Before you send an enquiry
Do you test every fiber or a sample?
Every fiber, bidirectionally, including dark spares. A spare that was never tested is not a spare — it is an assumption you find out about on the day you need it.
Can you find a fault on a route you did not install?
Yes. OTDR fault location works regardless of who built the route, though it goes considerably faster where as-built records and baseline traces exist. Where they do not, we will usually recommend re-certifying the route while we are there so the next fault is cheaper.
Can you add capacity without laying new cable?
Often. If the existing fiber has headroom, CWDM or DWDM can multiply capacity on the strands already in the ground for a fraction of the cost of construction. We will test what is there and tell you honestly whether it will carry the wavelength plan before anyone commits to equipment.
Next step
Let’s build a connected tomorrow.
Contact our engineering team to design, upgrade or manage your critical telecom infrastructure. Send a scope, a drawing or just the problem, and we will come back with an approach and a priced proposal.