Everything the protection scheme quietly depends on.

Power & utilities

Station DC systems, protection and control communications, station bus networks and substation telecom — designed, installed and maintained for distribution and transmission.

A substation has one job it cannot fail at: clear a fault and tell the control centre it did. Everything behind that — the battery, the charger, the station bus, the teleprotection path — exists to make a few milliseconds work reliably for twenty years.

We build and maintain that supporting infrastructure for 13.8 kV distribution through to 380 kV transmission, and we document it to the standard a utility engineering department expects before it will accept a station.

  • Ambient temperature destroys battery life

    A lead-acid battery loses roughly half its design life for every 10 °C above 25 °C. The sizing has to use switchroom ambient, not outdoor shade temperature, and the charger needs temperature compensation wired to a probe on the battery rather than a guess in firmware.

  • Earth faults are found the hard way

    An undetected earth fault on a DC bus is benign until the second one arrives and trips a breaker nobody asked to trip. Detection on both polarities is the minimum; branch-circuit location is what lets a technician find it without de-energising the station bus.

  • Remote sites are expensive to visit

    Where a fault means a four-hour drive, N+1 redundancy and genuine remote alarm reporting pay for themselves on the first avoided call-out. We size spares on travel time, not on list price.

  • The station outlives everyone who built it

    Stations get extended ten and fifteen years later. Work documented down to part numbers, point lists and configuration backups is what makes a matching extension possible instead of a rebuild.

Capabilities

Related services

  • Station DC systems

    Battery and charger sizing to IEEE 485, DC distribution with earth-fault detection on both polarities, installation, commissioning charge and maintenance trended to IEEE 450.

    Learn more
  • Station networks and teleprotection

    IEC 61850 station and process bus, redundant ring topologies with verified reconvergence, time distribution, and the fiber paths that carry protection signalling between bays and sites.

    Learn more
  • Substation telecom and communications

    Telecom rooms, microwave and fiber backhaul, control-room to switchyard talk-back and evacuation messaging for manned stations.

    Learn more

How we work here

  • Battery sizing to IEEE 485 showing the duty cycle, including momentary trip and close currents.
  • System architecture and redundancy to IEEE 946; DC protection coordination to IEEE 1375.
  • Station networks to IEC 61850, with failover times measured at commissioning rather than quoted.
  • Assemblies built and type-tested to IEC 61439-1 and IEC 61439-2.
  • Maintenance and acceptance testing to IEEE 450, IEEE 1188 or IEEE 1106 by chemistry.
  • Work on live stations under permit, with an agreed isolation and rollback plan.

Related services

  • DC systems

    Industrial AC/DC rectifiers, chargers and EMS battery backup.

  • Networks

    Scalable LAN/WAN, SD-WAN, DWDM transport and zero-trust cybersecurity.

  • Telecom services

    Full RF deployment, site acquisition and 24/7 NOC operations.

  • Fiber optics

    FTTx deployments, precision splicing and OTDR testing.

Frequently asked questions

Before you send an enquiry

Can you work to a utility's own technical specification?

Yes, and we prefer to. Send the specification and we return a clause-by-clause compliance statement marking each requirement complied, complied with comment, or not complied. The exceptions are the valuable part of that document — a contractor who marks every clause compliant has usually not read it.

Will you work on an energised station?

Routinely, under permit, with isolation and a written rollback plan agreed before mobilisation. Where a task genuinely cannot be done live, we say so at proposal stage and plan the outage with you rather than discovering it on the night.

Do you handle IEC 61850 station networks?

Yes — station bus and process bus design, build and commissioning, including redundancy testing by physically pulling links rather than trusting the protocol timer. For many stations what is actually needed is sound DNP3 or Modbus TCP into the gateway, and we will say so if that is the honest answer.