The supply that keeps the network up when the AC goes away.
DC systems
Industrial AC/DC rectifiers and chargers, lithium-ion and VRLA battery backup, modular UPS and smart energy management — sized, installed and maintained to IEEE standards.
When the incoming AC supply fails, the radios, transmission equipment, protection relays and SCADA gateways all run from one place: the DC plant and its battery. The rectifiers and chargers that keep it there are the least visible items in the room and the ones with the least tolerance for being wrong.
We supply, size, install and maintain DC power for central offices, tower shelters, substations and off-grid sites — industrial AC/DC chargers and rectifiers, lithium-ion and VRLA battery backup, modular UPS and smart energy management — against the standards your specification already references, and we issue the calculation rather than asking you to take the rating on trust.
Industrial AC/DC chargers and rectifiers
High-efficiency power conversion units for central offices and tower shelters, with N+1 modular redundancy and hot-swappable rectifiers.
Battery backup and modular UPS
Lithium-ion and VRLA power systems providing continuous operation during outages, with autonomy sized from your duty cycle to IEEE 485 rather than taken from a catalogue.
Smart energy management (EMS)
Remote telemetry integration and hybrid solar/grid management for off-grid sites, so rectifier, battery, generator and fuel status are visible from the NOC.
Maintained before it fails
Impedance or conductance testing trended against the commissioning values, so a cell degrading toward failure shows up on a report rather than during the next outage.
Capabilities
Scope of work
Design and sizing
- Battery sizing
- IEEE 485 for lead-acid, IEEE 1115 for nickel-cadmium, against your duty cycle
- System architecture
- Redundancy, distribution and protection coordination to IEEE 946 and IEEE 1375
- Ambient derating
- Rated against measured room temperature, with the derating curve issued
- Ventilation
- Hydrogen evolution assessment and ventilation requirements for the battery room
Typical ratings supplied
- Nominal DC
- 24, 48, 110, 125 and 220 VDC
- Output current
- 10 A to 600 A; higher by paralleled modules
- Topology
- Switchmode with N+1 redundant rectifiers, or SCR where specified
- AC input
- Three-phase or single-phase, matched to the site supply and frequency
- Regulation
- ± 0.5 % no load to full load; ripple < 1 % RMS with the battery connected
- Charge control
- Float, boost/equalise and commissioning charge, temperature compensated at the battery
- Battery chemistry
- Lithium-ion and VRLA; nickel-cadmium where specified
Backup and energy management
- Modular UPS
- Modular, hot-swappable UPS for AC-critical loads
- EMS telemetry
- Remote monitoring of rectifiers, batteries, generators and fuel into the NOC
- Hybrid power
- Solar, grid and generator hybrid control for off-grid and weak-grid sites
Protection and monitoring
- Earth-fault detection
- Positive and negative bus, adjustable threshold, optional branch location
- Alarms
- AC fail, charger fail, DC over/under-voltage, earth fault, battery disconnected, fuse operated
- Contacts
- Individually wired potential-free changeover contacts
- Protocols
- Modbus RTU and TCP, DNP3, SNMP; IEC 61850 where the station is fully digital
- Battery monitoring
- Open-circuit detection, end-of-discharge alarm, optional cell-level monitoring
Installation and maintenance
- Installation
- Charger, distribution, battery stands or cabinets, interconnection and labelling
- Commissioning
- Full functional test, commissioning charge, cell voltage baseline recorded
- Preventive maintenance
- To IEEE 450, IEEE 1188 or IEEE 1106 by chemistry
- Capacity testing
- At the interval your insurer or regulator requires, with trended results
- Replacement
- Battery replacement programmes including removal of the old set
Figures on these pages describe what we routinely deliver. Anything specific to your site is confirmed from a survey before it is priced.
Standards we work to
IEEE 485
Sizing lead-acid batteries for stationary applications
IEEE 1115
Sizing nickel-cadmium batteries for stationary applications
IEEE 946
DC auxiliary power systems for generating stations and substations
IEEE 1375
Protection of stationary battery systems
IEEE 450 / 1188 / 1106
Maintenance and testing — vented lead-acid, VRLA and nickel-cadmium
IEC 61439-1/-2
Low-voltage switchgear and controlgear assemblies
UL 1012
Power units other than Class 2
NFPA 70 Art. 480
Storage batteries — installation requirements
IEEE 1679.1
Lithium-based batteries in stationary applications
UL 9540
Energy storage systems and equipment
Typical applications
- Telecom central offices and tower shelters
- Off-grid and hybrid solar/grid sites
- Substation protection and control — trip, close and relay supply
- Switchgear spring-charging motors and motorised isolators
- SCADA gateways, RTUs and IEDs
- Telecom equipment rooms at −48 VDC and +24 VDC
- Fire and gas detection and emergency shutdown panels
- Generating plant and turbine control systems
- Emergency lighting inverter DC input
What you receive
- IEEE 485 or IEEE 1115 sizing calculation for your duty cycle
- General arrangement drawing, schematic and terminal schedule
- Alarm and communications point list, issued before manufacture
- Factory and site acceptance test records, countersigned
- Commissioning charge record with individual cell or block voltages
- Operation and maintenance documentation and operator training
- Recommended two-year spares holding, priced at order stage
Where we do it
Power & utilities
Protection, control, SCADA communications and DC power for grids and substations.
Oil & gas
Hazardous-area communications and DC power for plants, terminals and offshore.
Transportation
Operational radio, corridor networks and passenger communications for transport.
Frequently asked questions
Before you send an enquiry
Switchmode or SCR?
Switchmode is the default for new work: modular N+1 redundancy, hot-swappable rectifiers, high power factor and a much smaller footprint. SCR remains appropriate where the specification mandates it, where an existing fleet needs to stay consistent, or where the bus feeds unusually noisy inductive loads. If your specification is silent, we propose switchmode and explain the trade-off.
Can you work on an existing installation?
Yes — extensions, like-for-like replacements and battery changes are routine. Send the nameplate of the existing unit, the battery details and a photograph of the DC distribution section. Matching the alarm contact arrangement usually matters more than matching the physical dimensions.
How often should the battery be capacity tested?
IEEE 450 suggests an acceptance test, a performance test within the first two years, and then periodically at intervals that shorten as the battery ages — with annual impedance trending in between. The right interval for your site also depends on criticality and what your insurer expects, and we will recommend one rather than default to the longest permissible.
Next step
Let’s build a connected tomorrow.
Contact our engineering team to design, upgrade or manage your critical telecom infrastructure. Send a scope, a drawing or just the problem, and we will come back with an approach and a priced proposal.